Our peering and form-work started today. Ran into an issue though as our septic seepage bed is under where the garage will be.
4 of the
peers are filling up with water and they cant get a decent depth. Looks
like we will have to decommission the bed now rather than later. I'll
need to install 2x 7500L collection wells. Problem is trying to squeeze
it all in with all the soil and stuff in the way and this is holding up the build until I sort it out..
Love a good challenge.....
No comments:
Post a Comment