Today was very productive. At one point we had the plumbers, tiler and kitchen installer here all hooking in at the same time.
The plumbers installed the down pipes and the tiler did the bases for the spa bath and the bases for the floor tiles and he also installed the floor waste drains.
The kitchen guy installed the kitchen cupboards, kick-boards and bulkheads as well as the cupboards for the ensuite.
Looks like he will be back tomorrow to install the cupboard for the main bathroom along with the tiler who should hopefully start tiling.