Today was one of the busiest days to date.
We had both the garage doors installed, the spa bath installed and the plumbing completed, the electrical fit-out was completed and the shelving for all the cupboards were installed as-well.
Pantry:
Linen:
Bedroom:
Walk in robe:
Ensuite heat-light:
Power point & switches:
Bathroom heat-light:
Front garage door:
Inside garage door:
Rear garage door:
Spa Pump:
Spa pump box:
Spa:
Ensuite shower completed:
Gas regulator:
Its all looking great PS