Pages

Thursday, 7 February 2013

Heaps done

Today was one of the busiest days to date.
We had both the garage doors installed, the spa bath installed and the plumbing completed, the electrical fit-out was completed and the shelving for all the cupboards were installed as-well.

Pantry:

Linen:

Bedroom:

Walk in robe:

Ensuite heat-light:

Power point & switches:

Bathroom heat-light:

Front garage door:


Inside garage door:

Rear garage door:

Spa Pump:

Spa pump box:

Spa:

Ensuite shower completed:

Gas regulator:

1 comment: