Saturday, 9 February 2013

Handles & accessories

We had the builders here today and they have installed all the door handles and locks as-well as the accessories for the bathroom, ensuite and laundry.
This also marks the 13th day in a row of work done on the house. It is really flying along now and we should hopefully have the keys within the next 2 weeks. :)
















Nearly there

Another big day. We had Sentinel, roof insulation and the shower screens & mirrors installed today.

Sentinel stuff:













Mirrors + shower screens:




Thursday, 7 February 2013

Heaps done

Today was one of the busiest days to date.
We had both the garage doors installed, the spa bath installed and the plumbing completed, the electrical fit-out was completed and the shelving for all the cupboards were installed as-well.

Pantry:

Linen:

Bedroom:

Walk in robe:

Ensuite heat-light:

Power point & switches:

Bathroom heat-light:

Front garage door:


Inside garage door:

Rear garage door:

Spa Pump:

Spa pump box:

Spa:

Ensuite shower completed:

Gas regulator:

Wednesday, 6 February 2013

Plumbing fit-out

The plumbers were here today and installed the 2 toilets, all the taps, range-hood vent and ducting and also the gas hot water system.

It looks like they started setting up the spa as-well but they will need the electrician to wire it all up.

We are missing the hand held shower for the ensuite and the nozzle above the spa bath and the it looks like the bricks have been smashed out to access the pipework for the HWS, which is a bit bodgy.
I hope the brickie can work his magic and fix it so it doesnt look out of place.