Today was one of the busiest days to date.
We had both the garage doors installed, the spa bath installed and the plumbing completed, the electrical fit-out was completed and the shelving for all the cupboards were installed as-well.

Pantry:

Linen:

Bedroom:

Walk in robe:

Ensuite heat-light:

Power point & switches:

Bathroom heat-light:

Front garage door:


Inside garage door:

Rear garage door:

Spa Pump:

Spa pump box:

Spa:

Ensuite shower completed:

Gas regulator: